What should be included in a site plan?
What should be included in a site plan?
What a Site Plan Should Include
- Property Lines and Setbacks.
- Easements.
- Construction Limits and Lay Down Areas.
- Existing and Proposed Conditions.
- Driveways.
- Parking.
- Surrounding Streets and Ground Sign Locations.
- Fire Hydrants.
How do you show a roof in a site plan?
Open the plan view of the level in which you want to see the roof line. 2. In the view properties, expand the Underlay drop-down and select the level on which the roof was created to display as an underlay. This makes the roof line visible in the plan view, but the lines appear as solid lines.
What are grid lines used for on a blueprint?
Gridlines & Dimensions between gridlines indicate where a building element is placed based from a reference point on plan. Dimensions and gridlines on plans aid in the construction of structural elements (walls and columns). The centerlines of these elements are indicated best to accurately position them on site.
What are the basic information needed to prepare for a site development plan?
A Site Development Plan depicts the general layout and configuration of a site, including building footprints, parking and street layout, conceptual landscaping and lighting, site cross section drawings, and building elevations.
How do you plan your site layout?
Site layout planning involves four basic processes:
- Identifying the site facilities that will be required.
- Determining the sizes, and other constraints of those facilities.
- Establishing the inter-relationships between the facilities.
- Optimising the layout of the facilities on the site.
Why is grid important on a map?
A grid system on a map is usually square and is represented by drawn lines on the map creating those squares. The purpose of the grid system is to give each point in the map an identifier, an address, by which we can refer to it by.
What are grids in architecture?
At its simplest, a grid system is a series of evenly spaced blocks that help the designer organize and structure their designs in a way that is optimized for the visual flow of information.
What types of activities are required to prepare the site for construction?
Below are the five necessary steps involved in implementing a site preparation for construction projects.
- Site Clearing. Clearing the site is the very first step in site preparation.
- Site Surveying.
- Soil testing.
- Site Plan Design.
- Site Investigation.