What is a project manual in construction?
Table of Contents
- 1 What is a project manual in construction?
- 2 What are the 6 standard phases of a construction project?
- 3 Who is responsible for the project manual?
- 4 What are the steps involved in building construction?
- 5 What is the first step in a construction project?
- 6 What are three types of construction documents?
What is a project manual in construction?
Project Manual—The written documents prepared for, or made available for, procuring and constructing the Work, including but not limited to the Bidding Documents or other construction procurement documents, geotechnical and existing conditions information, the Agreement, bond forms, General Conditions, Supplementary …
What are the 6 standard phases of a construction project?
Likewise, a project that results in the development of a new product might contain the following phases: conceptual, technical feasibility, development, commercial validation and production preparation, full-scale production and product support.
What is the most important document on a construction project?
It is acknowledged that the building plans and construction drawings are the most important documents for a construction project.
How do you create a project manual?
Project Manual Documentation Template – Outline
- PROJECT OVERVIEW. Summary of Research: In a brief statement describe the research to be performed and the data to be developed.
- PROJECT MANAGEMENT AND ORGANIZATION PLAN.
- DATA COLLECTION AND PROCESSING DOCUMENTATION.
- DATA ANALYSIS DOCUMENTATION.
Who is responsible for the project manual?
This is the portion of the Project Manual which the ARCHITECT is directly responsible.
What are the steps involved in building construction?
The following are the building construction steps involves for any type of construction.
- Site Preparation or Leveling.
- Excavation and PCC.
- Foundation.
- Plinth Beam and Slab.
- Superstructure – Column.
- Brick Masonry Work.
- The Lintel Over Door Window Gaps.
- Floor Slab or Roof Structure.
What are the different types of construction projects?
Broadly speaking, construction project are either public or private — but those are further broken down into 4 types:
- Private residential projects.
- Private commercial projects.
- State construction projects.
- Federal construction projects.
What are the five main characteristics of construction project activities?
What I understand from your inquiry, the main characteristics of a projects can be, but not limited to,
- Definite start and end time (time limit)
- Unique.
- Specified target.
- Limited Resources.
- Financials (limited)
- Uncertainty factors (Risks) etc.
- Scope.
What is the first step in a construction project?
What are the 6 steps of a construction process?
- Conception (aka planning and development) Planning and development, sometimes called project conception, is the very beginning of the construction process.
- Design.
- Preconstruction.
- Procurement.
- Construction.
- Post construction.
What are three types of construction documents?
Generally, there are three different types of construction specifications found in contracts: prescriptive specifications, performance specifications, and proprietary specifications.
What are included in construction documents?
Construction documents describe the products, systems, quantities, configuration, and performance specifications that deliver the overall design intent of the project. It is important to keep in mind, however, that the CDs are not a set of instructions for building.