What are the components of dry docking?
What are the components of dry docking?
dry dock, type of dock (q.v.) consisting of a rectangular basin dug into the shore of a body of water and provided with a removable enclosure wall or gate on the side toward the water, used for major repairs and overhaul of vessels. When a ship is to be docked, the dry dock is flooded, and the gate removed.
What happens when a ship is in dry dock?
A dry dock is a type of docking facility that can be flooded to allow a boat or ship to float in, then be drained once the vessel is positioned on supports. This gives shipyard workers access to the ship’s hull and other areas that are usually underwater. No passengers are allowed onboard while a ship is in dry dock.
Why do ships go to drydock?
The main purpose of a Dry Dock is to expose the underwater parts for inspection, repair and maintenance. The ship to be repaired is hence manoeuvred into the lock and the gates are sealed post which all the sea water accumulated in the vessel is drained for better inspection and repairs.
How the ship enters the drydock and rests on the blocks?
When the ship enters the dry dock, her centerline is first brought in line with the centerline of the keel blocks by using a combination of plum lines and Leica theodolite. The dock gates are then closed and the water is pumped out of the dock in stages.
How do you make a drydock?
To build your Dry Dock, you need to download the Rising Tide update, then log in. When you get in the game, Ordis sends you a message telling you that he has discovered a Dry Dock Schema that he feels will be of interest to you and your fellow Tenno. After that, it is off to the Clan Dojo to build it.
How does a ship schedule for dry dock is being prepared?
Days before a ship is to be dry docked, the dock master will prepare a docking plan, taking into consideration all the minute details of the structure of the ship, i.e. hull structure of the ship, locations of the drain plugs, and echo sounders beneath the ship so as to not damage them during docking the ship.
How long does it take to build a drydock?
12 hours
The Dry Dock takes 12 hours to build (can be Rushed).
How do you prepare a ship for departure and trial?
- Ensure that those aboard are intended to be there before departure. Check for stowaways.
- All watertight doors and hatches should be secured.
- Loose gear on all decks should be secured.
- Clear all obstructions or floating debris around the vessel.
- Ensure proper PPE for all at mooring lines.
- Inform engine room before cast-off.