Which company made Metro in India?
Table of Contents
Which company made Metro in India?
Bombardier Transportation1 Bombardier has been a supplier to Indian Railways for over three decades and established the Metro Coach manufacturing facility at Savli in 2008.
Who has made the metro rail project in India?
Delhi Metro Rail Corporation
The metro system is operated by Delhi Metro Rail Corporation (DMRC), a public sector company established by the Government of India and the Government of Delhi in March 1995. The project was developed in multiple phases. Phase one (65.11km) and phase two (124.9km) are completed, while phase three is currently underway.
Why is Nagpur the second capital of Maharashtra?
After the first reorganisation of states, the city lost its capital status but according to the “Nagpur Pact” between political leaders it was made the second capital of Maharashtra. Nagpur is also called, “Tiger Capital of India ” as it connects many Tiger Reserves in India to the world.
How much did it cost to build Nagpur Metro?
The Central Ministry had allocated ₹2.4 crore (equivalent to ₹ 3.6 crore or US$510,000 in 2019) to the State Government for carrying out the DPR work. To execute the project, the Cabinet approved setting up of Nagpur Metro Rail Corporation Limited (NMRCL) now known as Maharashtra Metro Rail Corporation Limited (MAHA-METRO).
Who will supply 69 coaches to Nagpur Metro?
China Railway Rolling Stock Corporation (CRRC) has bagged the contract for the supply of 69 coaches to the Nagpur Metro, by beating BEML and Titaghar Wagon with the lowest bid of Rs 851 crore. Nagpur Metro Rail Project will consist of 38.215 Km metro corridor, 36 stations and 2 depots.
What is Maha Metro Nagpur?
Maha Metro is a Special Purpose Vehicle (SPV) created for the smooth implementation and operations of the Nagpur Metro Rail Project and is a joint venture of Government of India and Government of Maharashtra, with 50:50 equity.
What is the study area of Nagpur Metro study area?
The study area consisted of Nagpur Municipal Corporation Area. The study area totalled to approximately 217 km. Based on the different types of surveys done by DMRC, metro alignments were finalised after repeated inspection of the road network, intersections, passenger traffic flow, traffic congestion, connectivity to important land uses.